Basics of Sub-Contracts

Basics of Sub-Contracts

Purpose:

To Create a Sub-Contract.

Background:

With Contractor Foreman, Sub-Contracts can be handled easily and quickly. All Sub-Contracts can be tracked in Contractor Foreman as well as reported on and sorted by Project.

Points to Remember:

Required fields are marked with an Asterisk (*.) To save your work, click the blue Submit button. To edit the record, click the green pencil icon in the upper right corner. Deleting Items can only be done by a person with Admin Rights or if you are given access to do so. If a Sub-Contract needs to be Deleted, you can do so by clicking on the Action button at the bottom of the page on the right.

Steps to Create a New Sub-contract:

  1. Navigate to Main Menu.
  2. Click on Sub-Contracts.
  3. Click on blue button Create a New Sub-Contracts on the left.
  4. Enterthe followinginformation:

Details Tab:

  • Project: Select from System List. (Mandatory)
  • Subject: (Mandatory)
  • Date / Agreement #:
  • Issued By: Select from Drop-down.
  • Sub-Contractor: Select from System List.
  • Work Retainage %:
  • Response: Select one. Accept or Reject
  • Add an Attachment: Upload all Photos & Files in link to this Project. (On the phone or Tab this would be a Camera button so just click away & it will upload here automatically)

Items Tab:

  • Import Items From: Select from Drop-down.

Terms Tab:

  • Sub-Contract (Terms and Conditions): Select option “ Default “ Custom “ Both.
  • Default:
  • Scope of work:
  • Inclusions:
  • Exclusions:
  • Clarifications:
  • Document Notes:
    • Related Articles

    • Basics of Reports

      Purpose: To easily and quickly get you the data you need to help you run your business.. Background: Within Contractor Foreman there are multiple pre-built reports for you to use. And we are adding more all the time. Points to Remember: All Reports ...
    • What are the benefits of Sub-Contracts?

      This Module helps your track of your Sub-Contract work, allows you to add Terms & Items that need to be done. You can link it to a project, add Agreement number & Date, assign a Sub-Contractor & Upload Files & Photos pertaining to the Project. You ...
    • How do I generate a Bill from the Sub-Contract?

      To Generate a Bill from Sub Contracts, go to the Menu and choose Sub Contract. Select the Sub Contract you want to generate a Bill for. Scroll down to the bottom of the Sub Contract and go to the Actions drop down and from the drop down, select ...
    • What are the benefits of using a Sub-Contract instead of a Purchase Order?

      The benefits of using a Sub-Contract instead of a Purchase Order is that, there is a lot of clarification on Sub Contract in terms of Terms & Conditions. Besides Default Terms, there will be Scope of Work, Inclusions, Exclusions and Clarifications ...
    • Basics of Daily Logs

      Purpose: To create a Daily Log. Background: Daily Logs are an important document to have filled out every day for each ongoing project. Contractor Foreman provides an easy method for tracking daily activities on the jobsite with Daily Logs. You can ...